Categories

Aviva Equipments Pvt Ltd

Milk Pasteurizer 500 LPH

₹ 1011000.00  Incl. GST ₹ 856779.66 Excl. GST

Description

Milk Pasteurizer 500 LPH
 
TypePlate Heat Exchanger
Capacity500 LPH
ProductMilk
Temp Program4 – 55 - 65 – 78 - 4 Deg
Regeneration Efficiency90%
SectionsHeating, R1, R2, Heating & Chilling

Utilities:
  • Power supply of 440 V 3 Phase.
  • Compressed Air of 6 KG/Cm2
 Basis of operation:

Milk shall be pasteurized at a temperature of 78 deg C. then it shall be passed through the regenerations, and chilling sections of the pasteurizer. Finally chilled milk at 5 deg. C shall be left at the outlet of pasteurizer for further processing by client. (However, our scope is limited to supply of Plate pack skid only, all other accessories required shall be arranged by client.)

Technical specifications:

  • Plates: The plates shall be made from stainless steel in sanitary design. All the product contact and exterior surfaces shall be easily accessible or readily removable for cleaning and inspection.
  • Gaskets: The sealing gaskets must ensure complete sealing and pre-vent any cross - leakage between product and service liquids. Gaskets shall be of sanitary type and shall continuously bond to the heat transfer surface.            The gasket material shall be food grade, non-toxic, and fat resistant, non-absorbent and shall have smooth surface. The material shall withstand a water sterilization temperature of 100 Deg. C and 2% caustic solution at 80 Degree Centigrade. The Gaskets shall be glue free LOC in type.
  • Supporting Frame: The supporting frame for the plate pack shall be of a self-supporting design made of stainless steel (AISI 304) clad mild steel with a manually operated stainless steel (AISI 304) tightening device. The tightening device shall be able to exert uniform pressure on all the parts of heat transfer plates to prevent any leakages from Pasteurizer. The frame and tightening device shall prevent the plates from deflecting under pressure differential of minimum 4 kg/sq.cm.
Accessories:
  • Inlets/Outlet: The inlets and outlets in each section of the heat exchanger for products as well as services shall be provided with complete stainless steel (AISI 304) unions.
  • Thermo-wells:  SS (AISI 304) pockets for thermometer on required ports for Product and service inlet and outlet connections. Suitable nos. of pockets are included. However, thermometers are included in our scope of supply.
  • Ball Feet: The frame shall be provided with adjustable SS ball feet with provision for height adjustment of 50 mm.
  • Balance Tank: Balance tank would be made from SS 304 of 200.00 Liters volume. SS float valve would be providing for auto control of cream flow control.
  • Pumps and Pipe fittings: Pasteurizer Unit will supply with complete skid. Skid would be containing items as below table.
   

Control Panel:- PID based Control Panel

  •  Housing
  • I/P Convertor
  • Temp Chart recorder for two channels
  • Switches and controls for operator interface
   Battery Limits:
  • Fresh Product: Fresh Product at a temperature mentioned in data sheet shall be made available & connected by the Client at the inlet of the equipment.
  • Finished Product: Finished Product shall be made available by VMPPL at the outlet of equipment for onwards transfer by Client. 
  • Chilled Water: Chilled water supply and return in specified quantity and pressure shall be made available and connected to by the Client wherever required. (However, this is in our scope)
  • Hot Water: Hot water supply and return in specified quantity and pressure shall be made available and connected to by the Client wherever required. (However, this is in our scope)
  • Compressed air: Instrument quality compressed air at 6- bar pressure shall be made available and connected by the client wherever required.
  • Process Quality Water: Process quality water at pressure and in required quantity shall be made available and connected by the client wherever required.
  • Electrical Power: Client shall provide electrical supply including earthing at the incoming connection of our machines.
  • GUARANTEE: The company guarantees that the goods manufactured by it and delivered hereunder will be free of defects in material and workmanship for a period of twelve (12) months from the date of shipment. The purchaser shall be obligated to promptly report any failure to conform to this guarantee, in writing to the company within said period, whereupon the company shall at its option, correct such nonconformity by suitable repair to such goods, or furnish a replacement, provided the purchaser has stored, installed, maintained and operated such goods in accordance with good industry practices and has complied with specific recommendations of the company. The company shall not be liable for any repairs, replacements or adjustment to the goods or any costs of labor performed by the purchaser or others without the company's prior approval. The purchaser shall not operate/use such goods, which is considered to be defective, without first notifying the company in writing of its intention to do so.  Any such use of goods will be at purchaser's sole risk and liability. The effects of corrosion, erosion and normal wear and tear and electrical items and components are specifically excluded from warranty. Performance warranties are limited to those specifically stated within the company's proposal.
  • FORCE MAJEURE: In all cases where the delay or failure in performance of this contract is directly or indirectly caused by or due to an act of god, war, mobilization; demobilization, requisition by/ or interference from government or local Authorities, force majeure lockout, labor disturbance, trade disputes, unavailability or shortage of materials, fires, riots, strikes, and/or civil commotion or any events or circumstances whatsoever beyond the control of the company then in such case, the company shall be entitled to an extension of time for performance of this contract for a period corresponding to the period of delay.
   

Exclusions:

  • All types of civil works including grouting of inserts, floor supports, finishing of cut outs etc.
  • All utility and product piping, electrical outside specified battery limits. Any additional piping shall have to pay additionally.
  • Any other item not specifically mentioned by us.
SELLER: Aviva Equipments Pvt Ltd

Milk Pasteurizer 500 LPH

Product code (MPN): ITB-B1E126E9
Availability:In Stock
₹ 1011000.00  Incl. GST ₹ 856779.66 Excl. GST
  • Description
    Milk Pasteurizer 500 LPH
     
    TypePlate Heat Exchanger
    Capacity500 LPH
    ProductMilk
    Temp Program4 – 55 - 65 – 78 - 4 Deg
    Regeneration Efficiency90%
    SectionsHeating, R1, R2, Heating & Chilling

    Utilities:
    • Power supply of 440 V 3 Phase.
    • Compressed Air of 6 KG/Cm2
     Basis of operation:

    Milk shall be pasteurized at a temperature of 78 deg C. then it shall be passed through the regenerations, and chilling sections of the pasteurizer. Finally chilled milk at 5 deg. C shall be left at the outlet of pasteurizer for further processing by client. (However, our scope is limited to supply of Plate pack skid only, all other accessories required shall be arranged by client.)

    Technical specifications:

    • Plates: The plates shall be made from stainless steel in sanitary design. All the product contact and exterior surfaces shall be easily accessible or readily removable for cleaning and inspection.
    • Gaskets: The sealing gaskets must ensure complete sealing and pre-vent any cross - leakage between product and service liquids. Gaskets shall be of sanitary type and shall continuously bond to the heat transfer surface.            The gasket material shall be food grade, non-toxic, and fat resistant, non-absorbent and shall have smooth surface. The material shall withstand a water sterilization temperature of 100 Deg. C and 2% caustic solution at 80 Degree Centigrade. The Gaskets shall be glue free LOC in type.
    • Supporting Frame: The supporting frame for the plate pack shall be of a self-supporting design made of stainless steel (AISI 304) clad mild steel with a manually operated stainless steel (AISI 304) tightening device. The tightening device shall be able to exert uniform pressure on all the parts of heat transfer plates to prevent any leakages from Pasteurizer. The frame and tightening device shall prevent the plates from deflecting under pressure differential of minimum 4 kg/sq.cm.
    Accessories:
    • Inlets/Outlet: The inlets and outlets in each section of the heat exchanger for products as well as services shall be provided with complete stainless steel (AISI 304) unions.
    • Thermo-wells:  SS (AISI 304) pockets for thermometer on required ports for Product and service inlet and outlet connections. Suitable nos. of pockets are included. However, thermometers are included in our scope of supply.
    • Ball Feet: The frame shall be provided with adjustable SS ball feet with provision for height adjustment of 50 mm.
    • Balance Tank: Balance tank would be made from SS 304 of 200.00 Liters volume. SS float valve would be providing for auto control of cream flow control.
    • Pumps and Pipe fittings: Pasteurizer Unit will supply with complete skid. Skid would be containing items as below table.
       

    Control Panel:- PID based Control Panel

    •  Housing
    • I/P Convertor
    • Temp Chart recorder for two channels
    • Switches and controls for operator interface
       Battery Limits:
    • Fresh Product: Fresh Product at a temperature mentioned in data sheet shall be made available & connected by the Client at the inlet of the equipment.
    • Finished Product: Finished Product shall be made available by VMPPL at the outlet of equipment for onwards transfer by Client. 
    • Chilled Water: Chilled water supply and return in specified quantity and pressure shall be made available and connected to by the Client wherever required. (However, this is in our scope)
    • Hot Water: Hot water supply and return in specified quantity and pressure shall be made available and connected to by the Client wherever required. (However, this is in our scope)
    • Compressed air: Instrument quality compressed air at 6- bar pressure shall be made available and connected by the client wherever required.
    • Process Quality Water: Process quality water at pressure and in required quantity shall be made available and connected by the client wherever required.
    • Electrical Power: Client shall provide electrical supply including earthing at the incoming connection of our machines.
    • GUARANTEE: The company guarantees that the goods manufactured by it and delivered hereunder will be free of defects in material and workmanship for a period of twelve (12) months from the date of shipment. The purchaser shall be obligated to promptly report any failure to conform to this guarantee, in writing to the company within said period, whereupon the company shall at its option, correct such nonconformity by suitable repair to such goods, or furnish a replacement, provided the purchaser has stored, installed, maintained and operated such goods in accordance with good industry practices and has complied with specific recommendations of the company. The company shall not be liable for any repairs, replacements or adjustment to the goods or any costs of labor performed by the purchaser or others without the company's prior approval. The purchaser shall not operate/use such goods, which is considered to be defective, without first notifying the company in writing of its intention to do so.  Any such use of goods will be at purchaser's sole risk and liability. The effects of corrosion, erosion and normal wear and tear and electrical items and components are specifically excluded from warranty. Performance warranties are limited to those specifically stated within the company's proposal.
    • FORCE MAJEURE: In all cases where the delay or failure in performance of this contract is directly or indirectly caused by or due to an act of god, war, mobilization; demobilization, requisition by/ or interference from government or local Authorities, force majeure lockout, labor disturbance, trade disputes, unavailability or shortage of materials, fires, riots, strikes, and/or civil commotion or any events or circumstances whatsoever beyond the control of the company then in such case, the company shall be entitled to an extension of time for performance of this contract for a period corresponding to the period of delay.
       

    Exclusions:

    • All types of civil works including grouting of inserts, floor supports, finishing of cut outs etc.
    • All utility and product piping, electrical outside specified battery limits. Any additional piping shall have to pay additionally.
    • Any other item not specifically mentioned by us.
  • FAQs
    Need some help? Ask us!