Categories

Taurus Powertronics Private Limited

TFR- Tower Footing Resistance measurement

₹ 1.00  Incl. GST ₹ 0.85 Excl. GST

Description

Taurus STITAM offer services for Measurement of Resistance & Impedance of Tower Footing. High energy generated during a lightening stroke or heavy surges must be discharged immediately through the tower body.
Taurus STITAM offer services for Measurement of Resistance & Impedance of Tower Footing. High energy generated during a lightening stroke or heavy surges must be discharged immediately through the tower body. The earthing provided to Tower legs should provide least resistive path to this high energy. It is possible that sometimes the earthing provided is not proper and can cause disasters during heavy surges or during lightening.

We Taurus offer testing and measuring of Tower Footing Earth Resistance, Measuring of Impedance and Visual Inspection of Earthing provided to the tower. This is done without removing earthwire at the top of the tower but the virtual isolation of tower is done. Impedance is measured individually for each leg.
SELLER: Taurus Powertronics Private Limited

TFR- Tower Footing Resistance measurement

Product code (MPN): ITB-D16C1638
Availability:In Stock
₹ 1.00  Incl. GST ₹ 0.85 Excl. GST
  • Description
    Taurus STITAM offer services for Measurement of Resistance & Impedance of Tower Footing. High energy generated during a lightening stroke or heavy surges must be discharged immediately through the tower body.
    Taurus STITAM offer services for Measurement of Resistance & Impedance of Tower Footing. High energy generated during a lightening stroke or heavy surges must be discharged immediately through the tower body. The earthing provided to Tower legs should provide least resistive path to this high energy. It is possible that sometimes the earthing provided is not proper and can cause disasters during heavy surges or during lightening.

    We Taurus offer testing and measuring of Tower Footing Earth Resistance, Measuring of Impedance and Visual Inspection of Earthing provided to the tower. This is done without removing earthwire at the top of the tower but the virtual isolation of tower is done. Impedance is measured individually for each leg.
  • FAQs
    Need some help? Ask us!