OPEN CIRCUIT AND FULL LOAD CURRENT - Open circuit test is carried out for measuring iron losses and full load current test is carried out for determining for total losses including iron loss.3 phase 440 volt 200 amp variac gives supply to booster transformer. Tapping of booster transformer is taken 1100 volt ,2200 volt and 3300 volt .Between variac of 200 amp and booster transformer capacitor bank of maximum 200 KVAr is inserted in the binary arrangement to maintain stability of supply and improving of power factor. Tapping of booster transformer is changed manually according to need i.e. for testing of transformer 11kv/0.43kv , 22kv/11kv and 33kv/11kv.
Application
|
Transformer Testing
|
Construction Of Panel
|
MS Steel
|
Rated Current
|
100Amps
|
Power
|
1MVA
|
Phase
|
Three Phase
|
Ambient Temperature
|
50 degrees
|
Color
|
Grey
|
Display Type
|
Digital Meters
|
Frequency Range
|
50Hz to 100Hz
|