Operation Process
Solid Separation Zone
The first stage transforms the effluent solids to settled solids while allowing scum to float on the surface it is a primary sedimentation zone in which settled sludge is stabilized by anaerobic digestion. the treatment efficiency of the chamber is in the range of 30% BOD removal.
Product Details:
Capacity (KLD/MLD) |
500 KLD |
Feed Flow Rate(m3/day or m3/hr) |
101-500 m3/day |
Application Industry |
Residential & Commercial Building |
Treatment Technology |
Mixed Bed Bio Reactor(MBBR) |
Impurities to be removed |
Oil and Grease, Dissolved Minerals, Turbidity |
Air Blower Power (kW) |
1.5 kW |
Weight |
Up to 8 ton |
Air Blower Count |
2 |
Air Blower Flow (L/min) |
60 L/min |
Approximate Power Consumption (in kW) |
5 kW |
Installation Type |
Prefabricated |
Treatment Stages |
Preliminary Treatment, Primary Treatment, Secondary Treatment |
Minimum Order Quantity: 1
1 Pack contains : 1 Unit