We are specialized to design and sell our products at reasonable prices. We understand our client's requirements closely and provide them with the most suitable product.
2.Production period: about 3 months after all specification and drawing of machine are confirmed by the buyer.3. Shipment: On behalf of buyer, seller can arrange the shipping, but the shipping freight shouldbe borne by buyer. One machine needs about 4 pieces of 40HQ containers.4. Installation: Both side air tickets for Chinese Engineer, fooding, lodging. If the engineer stay exceeds 10 day then per day charge will be 80 USD.5. Warranty of the equipment:ONE YEAR from the date of delivery. If the damage of parts is caused by human error in operation from buyer side, buyer need to bear the parts cost.